CONDUCTOR & STATIC T-LINES
Rationale
The SAM.gov solicitation is for conductor and static transmission-line hardware procurement, NAICS 332510 (hardware manufacturing). This is a materials bid, not a construction project with a physical worksite. No site footprint, no lay-down yard, no mobilization phase, and no disclosed project value in the posted record. The procurement does not align with Zedcor's capability matrix: perimeter security, vehicle barriers, surveillance arrays, mobile towers, and vehicle monitoring all require an on-ground construction or operational site to secure. The solicitation posted May 6, 2026 and archives June 5, a 30-day window typical of federal hardware RFQs. The stage is pre-award solicitation, but the scope is component supply, not field work. Even if the hardware supports a downstream transmission-line construction project, that project is not visible in this record and would surface separately once a GC is awarded and site work begins. No Zedcor branch is within coverage radius because no project location is disclosed, transmission-line hardware procurement does not generate a security opportunity at the solicitation stage, and no actionable next step exists until a construction award with a known site materializes. This lead should be deferred. If the downstream construction project posts later with a geographic tie, it will surface as a separate record.
Project Facts
Contacts
Contacts at —
Contact lookup pending owner identification.
Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.
HubSpot
Outreach
Verifier
passed · all 4 checksverified on 2 of 4 — null-coordinate project, geographic checks skipped
Source Record
Solicitation details (sam.gov)
View on sam.gov ↗- Agency
- ENERGY, DEPARTMENT OF›ENERGY, DEPARTMENT OF›WESTERN-UPPER GREAT PLAINS REGION
- Contracting office
- BILLINGS, MT, 59101
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Solicitation #
- 89503426QWA001249
- Bid window closes
- 2026-05-21 19:00Z
- Archive date
- 2026-06-05
Activity timeline
- Ranked · score 15This is a hardware procurement without a disclosed construction site. Worth revisiting if the transmission-line build itself posts later with a location and GC.2026-05-07 01:01 · projects
- Verifiedverified on 2 of 4 — null-coordinate project, geographic checks skipped2026-05-07 01:01 · projects
- Project ingestedSource: sam.gov · posted 2026-05-062026-05-07 00:00 · projects