AE Shortlist for GSA PBS - CA, AZ, NV, HI - 2026

sam.gov · score 15
This lead has a score but hasn't been enriched yet.Request enrichment
Project Size
Stage
pre-budget
Distance
Posted
16 days ago
05-08-26

Rationale

The GSA Public Buildings Service sources-sought notice for architectural-engineering shortlist assembly across California, Arizona, Nevada, and Hawaii is a pre-budget federal signal that precedes actual project awards by 6-18 months. The notice does not describe a specific construction site or scope. it is a vendor qualification exercise GSA runs to build its bench of pre-approved A/E firms for future renovations, tenant improvements, and facility security upgrades across the four-state footprint. The value is undisclosed in the source record because no work is yet scoped. This is not a lead for immediate security deployment; it is a precursor to leads that will appear once GSA selects firms and those firms begin design phases on individual federal buildings. The notice posted May 8 via SAM.gov and sits in the pre-budget stage, which is the earliest possible timing tier but also the least actionable for a security contractor. GSA will shortlist A/E firms first, then those firms will design projects, then GSA will solicit construction GCs, then security scopes will solidify. That sequence typically takes 12-24 months from sources-sought to shovel. The correct action is to monitor the selected A/E firms (their names will appear in a follow-on SAM notice within 60-90 days) and track when they publish design documents that mention perimeter security, surveillance, or access control for specific GSA properties. No Zedcor branch falls within 300 miles of the notice's four-state region; the closest coverage is Houston at roughly 900 miles from the nearest Arizona property. This signal does not justify outreach today. The recommended move is to flag the notice for quarterly review and scan for downstream project announcements once GSA assigns A/E firms and those firms begin publishing scopes for individual federal buildings in the four-state zone. If Zedcor opens a West Coast branch, revisit the A/E shortlist at that time and cold-call the selected firms' federal-sector practice leads.

Project Facts

Owner
Not yet enriched
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
Not yet enriched
Industry
Not yet enriched
Stage
pre-budget
Timing
Not yet enriched
Location
Not yet enriched
Permit
Not yet enriched
Lot Size
Not yet enriched

Contacts

Contacts at —

Contact lookup pending owner identification.

Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
GENERAL SERVICES ADMINISTRATIONPUBLIC BUILDINGS SERVICEPBS CENTRALIZED ACQUISITION SERVICES IDV - WEST
Contracting office
Washington, DC, 20405
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Solicitation #
AESSLGSAPBSCAAZNVHI
Bid window closes
2026-06-01 23:00Z(8d)
Archive date
2026-06-16

Activity timeline

  • Ranked · score 15
    Flagged the GSA PBS A/E shortlist notice for CA/AZ/NV/HI, will revisit once selected firms publish design scopes for individual federal properties in 90-120 days. worth a ping then if any building security upgrades surface?
    2026-05-08 18:01 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-08 18:01 · projects
  • Project ingested
    Source: sam.gov · posted 2026-05-08
    2026-05-08 18:00 · projects