Navajo Generating Station decommissioning security

usaspending · score 28 · 242.3 miLas Vegas branch · 214.3 mi
Project Size
$1.9M
Stage
Planning
Distance
242.3 mi
Posted
38 days ago
04-16-26

Rationale

CACHED

USACE plans a $1.9M security envelope around the Navajo Generating Station decommissioning. multi-year perimeter for the ash-yard remediation. Project is at planning stage; bid documents expected 2026-Q3. Site is 220 miles from PHX branch, near the edge of the 300-mile coverage. The remoteness is actually a fit for the mobile-tower model. there's no permanent-cam vendor that'd compete on cost for a 36-month temporary install. No customer warm-intro. this is a cold federal opportunity, but the temporary-install economics are unusually strong. Worth a low-effort capability brief now.

Project Facts

Owner
US Army Corps of EngineersFEDERAL AGENCY
Prime Contractor
Project Size
$1.9M
Estimated Towers
Industry
562910
Stage
PLN
Timing
Location
Page, AZ36.9100, -111.3900
Permit
Not disclosed (federal contract)
Lot Size

Contacts

Contacts at US Army Corps of Engineers

Contacts not enriched (lead score below threshold).

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

Request enrichment →

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

passed all 4 checks

Source Record

USAspending

Activity timeline

  • Project ingested
    Source: usaspending · posted 2026-04-16
    2026-04-28 02:08 · projects
  • Ranked · score 28
    Navajo Generating decom is heading toward bid. 36-month temporary perimeter is exactly the mobile-tower wheelhouse. Sending capability brief this week.
    2026-04-28 02:08 · projects
  • Verified
    passed all 4 checks
    2026-04-28 02:08 · projects