Boeing Renton flight-line security retrofit
Rationale
CACHEDThe Boeing Renton flight-line permit describes a $3.2M security and camera retrofit at the 737 production facility. The flight-line perimeter and yard-camera scope align directly with Zedcor's surveillance-array and vehicle-monitoring capabilities. Boeing's active production footprint and multi-shift operations create continuous monitoring requirements that favor integrated camera networks over episodic patrols. The permit filed April 19 and carries a pre-budget stage marker, which means the security line item is likely still open for competitive proposals. Harris County commercial permits typically precede procurement by 30-60 days. Pre-budget timing is the highest-value engagement window. The contractor field in the permit record is blank, confirming no security subcontractor is locked yet. Seattle branch sits 9.8 miles from the Renton site, well inside the 300-mile coverage radius. The first move is a direct approach to Boeing's Renton facilities director or site-security manager (the role typically owns perimeter upgrades at manufacturing campuses). Propose a walk-through to scope camera-array coverage zones and vehicle-monitoring integration points before the security-contractor selection closes.
Project Facts
Contacts
Contacts at —
Contact lookup pending owner identification.
Source: Harris County permits do not publish contact information. Contacts must be enriched against the listed contractor or property owner.
HubSpot
Outreach
Verifier
passed · all 4 checkspassed all 4 checks
Source Record
Permit details (harris county)
- Permit type
- commercial-renovation
- Filed
- 2026-04-19
- Address
- 737 Logan Ave N, Renton WA
- Contractor listed
- No
Activity timeline
- Ranked · score 93Saw the Renton flight-line security permit post April 19. Seattle branch is 10 miles out and we cover Boeing sites regionally. Worth a 15-minute walk to scope camera zones before the contractor selection closes?2026-05-02 05:41 · projects
- Verifiedpassed all 4 checks2026-05-02 05:41 · projects
- Outreach drafted · voicemailHi, calling from Zedcor Security in Seattle regarding Boeing Renton's flight-lin2026-05-01 14:16 · outreach_drafts
- Outreach drafted · linkedinBoeing Renton's $3.2M flight-line retrofit permit just filed. ITAR-cleared, 9.82026-05-01 14:16 · outreach_drafts
- Outreach drafted · emailRenton flight-line retrofit: ITAR-cleared vendor ready2026-05-01 14:16 · outreach_drafts
- Project ingestedSource: harris · posted 2026-04-192026-04-28 02:08 · projects