Port of Seattle terminal access control
Rationale
CACHEDThe Port of Seattle RFP is a $4.1M access-control modernization across Terminals 5 and 18, a marine cargo facility with controlled vehicle entry points, pedestrian gates, and perimeter fencing along active waterfront berths. The scope aligns with vehicle barriers at truck ingress lanes, surveillance camera arrays covering container yards and berth approaches, and vehicle monitoring for credentialed driver verification. Terminal facilities operate 24/7 with shift handoffs and contractor traffic surges, creating persistent surveillance and access-validation requirements rather than episodic project-phase coverage. The RFP posted April 22 on SAM.gov with a May 22 response deadline, a 30-day window. This is pre-award solicitation stage, the optimal timing tier for influencing security line-item specification before vendor lock. The Port of Seattle procures under public-agency rules with formal proposal structure and typically weighted evaluation criteria favoring prior terminal or critical-infrastructure references. Seattle branch sits 1.2 miles from the port complex, inside the coverage radius with no warm-customer cross-pollination path available. The recommended first move is a call to the Port's facilities security director or the RFP's named point of contact (typically a procurement officer with a technical advisor) proposing a walk-through of Terminals 5 and 18 to map vehicle-flow choke points and camera sight-line constraints before the May 22 deadline.
Project Facts
Contacts
Contacts at Port of Seattle
Enrichment pending — click Run now to fetch.
Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.
HubSpot
Outreach
Verifier
passed · all 4 checkspassed all 4 checks
Source Record
Activity timeline
- Ranked · score 97Saw the Terminal 5 and 18 access-control RFP drop April 22, responses due May 22. Seattle branch is 1.2 miles out, worth a 20-minute walk-through to map vehicle lanes and camera positions before you finalize spec?2026-05-02 05:45 · projects
- Verifiedpassed all 4 checks2026-05-02 05:45 · projects
- Outreach drafted · emailPort of Seattle T5/T18 access-control RFP2026-04-29 03:53 · outreach_drafts
- Outreach drafted · linkedinPort of Seattle T5/T18 access-control RFP, $4.1M, closes May 22. Pre-bid confere2026-04-29 03:53 · outreach_drafts
- Outreach drafted · voicemailHi, calling from Zedcor Security Systems in Seattle. The Port of Seattle just re2026-04-29 03:53 · outreach_drafts
- Project ingestedSource: sam.gov · posted 2026-04-222026-04-28 02:08 · projects