SAA Construction MATOC

sam.gov · score 17 · 1535.7 miTampa branch · 1210.1 mi
Lead rejected — no_branch_coverage(2026-05-06)
Project Size
Stage
pre-budget
Distance
1535.7 mi
Posted
18 days ago
05-06-26

Rationale

The SAA Construction MATOC sources-sought notice is a pre-solicitation market-scan for a multi-award task order contract supporting the San Antonio Air Station, Puerto Rico. NAICS 236220 (commercial and institutional building construction) indicates vertical or facilities work rather than linear infrastructure. Value is undisclosed in the source record; the sources-sought stage means the agency is gauging contractor interest before releasing the formal solicitation. MATOC structures typically package multiple discrete projects over a multi-year span, which creates recurring site-security opportunities if the prime can bake surveillance and perimeter protection into each task-order budget. The notice posted May 6 via SAM.gov with a June 13 archive date, which places the formal solicitation release somewhere in the 30-60 day window following close of the sources-sought period. This is textbook pre-budget timing. The buying cycle has not locked; the prime contractor shortlist is forming now, and site-security scope is still malleable. Engaging a likely prime before RFP release embeds surveillance towers and camera arrays into the cost model rather than forcing post-award retrofits. Atlanta branch is the nearest at 1,536 miles, well outside the 300-mile coverage radius. The project sits in Puerto Rico, which is outside Zedcor's current operating footprint. Recommend deferring the lead unless Zedcor plans Caribbean expansion or can partner with a local surveillance provider to support the eventual prime. If expansion is under consideration, the MATOC structure makes this a multi-year anchor opportunity rather than a one-off.

Project Facts

Owner
Not yet enriched
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
Not yet enriched
Industry
Not yet enriched
Stage
pre-budget
Timing
Not yet enriched
Location
18.2208, -66.5901
Permit
Not yet enriched
Lot Size
Not yet enriched

Contacts

Contacts at —

Contact lookup pending owner identification.

Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier — Unverified

unverified
⚠ unverifiedpass count · 1

branch attribution mismatch — ranker=null recompute=atl-003; score drift ranker=0 recompute=17

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
DEPT OF DEFENSEDEPT OF THE ARMYUS ARMY CORPS OF ENGINEERSENGINEER DIVISION SOUTH ATLANTICENDIST CARIBBEANW2SR ENDIST CARIBBEAN(PROVIS)
Contracting office
SAN JUAN, PR, 00918-0000
Solicitation #
W51DQV-26-X-1BOF
Bid window closes
2026-05-29 16:00Z(5d)
Archive date
2026-06-13

Activity timeline

  • Ranked · score 17
    Saw the SAA Construction MATOC sources-sought drop May 6. We are not active in Puerto Rico yet, but if you are tracking Caribbean expansion the MATOC structure makes this a multi-year anchor rather than a single task order, worth a conversation on timing?
    2026-05-06 12:30 · projects
  • Project ingested
    Source: sam.gov · posted 2026-05-06
    2026-05-06 12:00 · projects