Ramp repair PH II
Rationale
The SAM.gov presolicitation for Ramp Repair Phase II is a NAICS 238110 concrete contractor award with an undisclosed value and no detail on site footprint in the source record. The concrete-work classification and phased structure (Phase II implies Phase I is complete or underway) suggest an active jobsite with equipment exposure and a multi-week duration, which fits mobile surveillance tower deployment for night and weekend coverage when crews are off-site. The lack of declared scope means the security angle is work-zone monitoring and equipment protection rather than permanent perimeter infrastructure. The notice posted May 1 as a presolicitation, the optimal timing tier for budget-line engagement. Presolicitation means the scope is not yet locked and the security subcontractor decision is still open. The archive date is June 5, which gives a 35-day window before the opportunity moves to formal solicitation or award. This is the exact window where a security conversation can influence the budget line before it hardens. Pittsburgh branch is the nearest at 146 miles, inside the 300-mile coverage radius. No warm-intro path exists in the region. The likely buying contact is the GC's project superintendent or the owner's facilities director if this is a public-agency asset. Lead with mobile-tower availability for the active work phase and propose a 15-minute site-survey conversation to scope coverage needs before the presolicitation closes June 5.
Project Facts
Contacts
2 surfacedContacts — 2 at W7NU USPFO ACTIVITY OHANG 180
HubSpot
Outreach
Verifier
passed · all 4 checksverified on 2 of 4 — null-coordinate project, geographic checks skipped
Source Record
Solicitation details (sam.gov)
View on sam.gov ↗- Agency
- DEPT OF DEFENSE›DEPT OF THE ARMY›NATIONAL GUARD BUREAU›JFHQ USPFO OH›USPFO OH PROCUREMENT›W7NU USPFO ACTIVITY OHANG 180
- Contracting office
- SWANTON, OH, 43558-9645
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Solicitation #
- W50S8S26BA001
- Bid window closes
- 2026-05-21 20:00Z
- Archive date
- 2026-06-05
Activity timeline
- Ranked · score 46Saw the Ramp Repair Phase II presolicitation post May 1. We cover the corridor from Pittsburgh, worth a quick call on mobile-tower coverage for equipment protection during the active work phase before the June 5 close?2026-05-02 07:34 · projects
- Verifiedverified on 2 of 4 — null-coordinate project, geographic checks skipped2026-05-02 07:34 · projects
- Project ingestedSource: sam.gov · posted 2026-05-012026-05-02 00:00 · projects