GRIT REMOVAL AND DISPOSAL APPROXIMATELY 60 TONS
Rationale
The solicitation covers grit removal and disposal at a wastewater facility near Baltimore, approximately 60 tons of accumulated sediment from clarifiers or grit chambers. The work involves confined-space entry, material handling equipment staging, and temporary storage of containerized waste before haul-off. Mobile surveillance tower coverage fits the equipment laydown and night-shift exposure during the extraction phase, and vehicle monitoring tracks hauler cycles if disposal runs occur over multiple days. Project value is undisclosed in the SAM.gov record. The solicitation posted May 1 as a combined synopsis, meaning the procurement window is open now and responses are likely due within 14-30 days. Pre-bid timing is the tightest engagement window; once the contract awards, the security scope (if any) is typically bundled into the contractor's general conditions rather than separately procured. The source is a federal wastewater facility, so the winning bidder may have existing security protocols that leave little room for add-on coverage. Pittsburgh branch is nearest at 194 miles, inside the 300-mile coverage radius. The recommended first move is to identify the facility's contracting officer or plant superintendent (named in the full solicitation file) and propose a brief conversation on temporary tower coverage for the staging area during grit extraction, framed as a question about site-access protocols rather than a bid. No warm customer path exists in the region.
Project Facts
Contacts
1 surfacedContacts — 1 at SFLC PROCUREMENT BRANCH 3(00040)
HubSpot
Outreach
Verifier
passed · all 4 checksverified on 2 of 4 — null-coordinate project, geographic checks skipped
Source Record
Solicitation details (sam.gov)
View on sam.gov ↗- Agency
- HOMELAND SECURITY, DEPARTMENT OF›US COAST GUARD›SFLC PROCUREMENT BRANCH 3(00040)
- Contracting office
- BALTIMORE, MD, 21226
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- Solicitation #
- 70Z04026Q60758Y00
- Bid window closes
- 2026-05-15 16:00Z
- Archive date
- 2026-05-30
Activity timeline
- Ranked · score 36Saw the grit removal solicitation post May 1 for the Baltimore facility. Pittsburgh branch covers the region at 194 miles; worth a quick call on temporary tower coverage for the staging area during extraction before bids close?2026-05-02 07:40 · projects
- Verifiedverified on 2 of 4 — null-coordinate project, geographic checks skipped2026-05-02 07:40 · projects
- Project ingestedSource: sam.gov · posted 2026-05-012026-05-01 18:00 · projects