N--R10 Lab: Laboratory Room & Fume Hood Controls Installation for the EPA Region 1

sam.gov · score 72 · 41.8 miWashington branch · 41.8 mi
This lead has a score but hasn't been enriched yet.Request enrichment
Project Size
Stage
pre-budget
Distance
41.8 mi
Posted
17 days ago
05-07-26

Rationale

The EPA Region 1 laboratory controls installation is a federal sources-sought notice for specialized HVAC and fume-hood control work inside an occupied federal facility. The scope centers on environmental-lab infrastructure rather than exterior construction, which limits perimeter or mobile-tower angles. The security opportunity sits in access control and surveillance for contractor staging areas, equipment laydown during phased installation, and after-hours monitoring of sensitive lab spaces during the work window. The notice posted May 7 as a sources-sought, the earliest pre-solicitation signal. Sources-sought typically precedes an RFP by 45-90 days, and federal lab work often triggers security-subcontractor prequalification early in the procurement cycle. This is first-tier timing for positioning before the security line item is defined. The federal facility context means the GC will need badged access and monitored staging, which opens a window for camera arrays and vehicle monitoring at entry points. Seattle branch sits 41 miles from the project, well inside the 300-mile coverage radius. No warm-intro path exists in the payload. The recommended contact is the EPA Region 1 facilities director or the contracting officer named in the SAM.gov notice (typically listed in the point-of-contact block). Lead with a question about security requirements for contractor staging and after-hours lab access during the phased installation, proposing a short conversation on camera coverage and vehicle-monitoring options before the RFP drops.

Project Facts

Owner
Not yet enriched
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
Not yet enriched
Industry
Not yet enriched
Stage
pre-budget
Timing
Not yet enriched
Location
47.4009, -121.4905
Permit
Not yet enriched
Lot Size
Not yet enriched

Contacts

Contacts at —

Contact lookup pending owner identification.

Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier — Unverified

unverified
⚠ unverifiedpass count · 1

branch attribution mismatch — ranker=null recompute=sea-005; score drift ranker=0 recompute=72

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
ENVIRONMENTAL PROTECTION AGENCYENVIRONMENTAL PROTECTION AGENCYREGION 7 CONTRACTING OFFICE
Contracting office
LENEXA, KS, 66219
Solicitation #
68HE0726Q0010
Bid window closes
2026-05-21 20:30Z
Archive date
2026-06-04

Activity timeline

  • Ranked · score 72
    Saw the EPA Region 1 lab controls sources-sought post May 7. Federal lab work usually triggers early security prequalification, worth a call on contractor-staging and after-hours access monitoring before the RFP?
    2026-05-08 01:00 · projects
  • Project ingested
    Source: sam.gov · posted 2026-05-07
    2026-05-08 00:00 · projects