36C26326R0038, PN: 438-23-450, Replace & Upgrade CLC HVAC {SF}

sam.gov · score 17 · 618.3 miIowa branch · 348.6 mi
Lead rejected — no_branch_coverage(2026-05-06)
Project Size
Stage
solicitation
Distance
618.3 mi
Posted
19 days ago
05-05-26

Rationale

The solicitation is an HVAC replacement and upgrade at a VA Community Living Center, a federal healthcare facility with controlled-access perimeters and continuous patient occupancy. The work involves mechanical systems inside a secure building envelope, likely requiring contractor staging areas, equipment laydown, and after-hours access during installation phases to avoid disrupting patient care. The scope does not declare a construction value, and the NAICS 238220 classification (plumbing, heating, air-conditioning contractors) indicates a mechanical subcontract rather than a ground-up build, so the security footprint centers on work-zone access control and equipment protection during nights and weekends rather than full perimeter build-out. The solicitation posted May 5, 2026, via SAM.gov. Pre-award solicitation is the ideal timing tier for security engagement, as the GC or facilities manager is still assembling the bid package and the security line item is uncommitted. Once the award closes, the subcontractor roster locks and displacing an incumbent is difficult. The window is open now. Chicago branch is the nearest at 618 miles, well outside the 300-mile coverage radius. The project sits in central South Dakota with no Zedcor footprint within usable range. Recommend deferring this lead unless Zedcor is actively scoping a Midwest expansion that would cover the Dakotas. If the expansion is planned, the contact is the VA's contracting officer or the facility's security director, reachable via the SAM.gov record, and the hook is a brief conversation on after-hours work-zone monitoring and equipment-protection coverage during the HVAC install phase.

Project Facts

Owner
Not yet enriched
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
Not yet enriched
Industry
Not yet enriched
Stage
solicitation
Timing
Not yet enriched
Location
44.2998, -99.4388
Permit
Not yet enriched
Lot Size
Not yet enriched

Contacts

Contacts at —

Contact lookup pending owner identification.

Source: sam.gov publishes pointOfContact data only when the contracting officer attaches it to the notice. Many solicitations omit it.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier — Unverified

unverified
⚠ unverifiedpass count · 1

branch attribution mismatch — ranker=null recompute=chi-004; score drift ranker=0 recompute=17

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
VETERANS AFFAIRS, DEPARTMENT OFVETERANS AFFAIRS, DEPARTMENT OFNETWORK CONTRACT OFFICE 23 (36C263)
Contracting office
Saint Paul, MN, 55101
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Solicitation #
36C26326R0038
Bid window closes
2026-05-08 15:00Z
Archive date
2026-09-30

Activity timeline

  • Ranked · score 17
    Saw the CLC HVAC solicitation post May 5. No Chicago coverage at 618 miles, but if Midwest expansion is on the roadmap, worth a call to the VA contracting officer on after-hours work-zone monitoring during install?
    2026-05-06 00:30 · projects
  • Project ingested
    Source: sam.gov · posted 2026-05-05
    2026-05-06 00:00 · projects