Cedar Rapids Flood Risk Management Project, Reach 4 Phase 1 Downstream River Floodwall and Pump Station

sam.gov · score 18 · 286.9 miIowa branch · 36.3 mi
Project Size
Stage
solicitation
Distance
286.9 mi
Posted
23 days ago
05-01-26

Rationale

The Cedar Rapids Flood Risk Management solicitation is a U.S. Army Corps of Engineers flood-control infrastructure build combining a downstream river floodwall with an integrated pump station. The project footprint will include perimeter fencing, construction lay-down yards, and multi-season active work zones along the riverbank, all of which create exposure for equipment theft and vandalism during nights and weekends. Mobile surveillance towers fit the extended-duration jobsite profile, and camera arrays can cover the linear floodwall sections where vehicle barriers and fixed perimeter are impractical during phased construction. The solicitation posted May 1, 2026, on SAM.gov. Pre-solicitation is the ideal engagement window because the GC has not yet locked security subcontractor pricing into its bid. Once the award closes and the winning contractor finalizes its subs, the security line item becomes entrenched. Project value is undisclosed in the source record, but Corps flood-mitigation builds of this type typically carry multi-year timelines and nine-figure federal obligations, which supports sustained surveillance-infrastructure deployment. Chicago branch is the nearest at 287 miles, just inside the 300-mile coverage radius. No warm-intro path exists in the geography. The recommended first move is to identify the Corps project manager listed in the solicitation documents and propose a pre-bid site survey focused on lay-down yard tower placement and riverbank camera-array coverage. The buyer contact is likely the Corps PM or the lead civil contractor's security coordinator once bids are visible.

Project Facts

Owner
W07V ENDIST ROCK ISLANDFEDERAL AGENCY
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
Industry
237990
Stage
solicitation
Timing
RFP closes 03-18-26
Location
Cedar Rapids, IA42.0115, -93.2105
Permit
Not disclosed (federal contract)

Contacts

2 surfaced

Contacts — 2 at W07V ENDIST ROCK ISLAND

Samantha JohansonContracting Officermanagergatekeeper
source: sam.gov-pointOfContact· conf 100%
Brunson GrothusContract Specialistmanagergatekeeper
source: sam.gov-pointOfContact· conf 100%

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
DEPT OF DEFENSEDEPT OF THE ARMYUS ARMY CORPS OF ENGINEERSENGINEER DIVISION MISSISSIPPI VALLEYENDIST ROCK ISLANDW07V ENDIST ROCK ISLAND
Contracting office
ROCK ISLAND, IL, 61299-5001
Solicitation #
W912EK26BA001
Bid window closes
2026-03-18 18:00Z
Archive date
2026-05-05

Activity timeline

  • Ranked · score 18
    Saw the Reach 4 floodwall solicitation post May 1. Chicago branch covers from 287 miles out, worth a 15-minute call on pre-bid tower placement for the lay-down yard and riverbank phases?
    2026-05-02 05:28 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 05:28 · projects
  • Project ingested
    Source: sam.gov · posted 2026-05-01
    2026-05-01 18:00 · projects