Streambank Stabilization Project – Little Wheeling Creek Site – EWP 2025 Ohio County, West Virginia

sam.gov · score 46 · 144.1 miPennsylvania branch · 144.1 mi
Project Size
Stage
solicitation
Distance
144.1 mi
Posted
26 days ago
04-28-26

Rationale

The Little Wheeling Creek streambank stabilization is a federal Emergency Watershed Protection solicitation involving linear earthwork along an erosion corridor. The project sits in a rural footprint with limited natural oversight, and the work pattern (grading, riprap placement, bioengineering installations) creates extended equipment exposure during nights and weekends. Mobile surveillance tower coverage fits the linear corridor better than fixed perimeter infrastructure, and vehicle monitoring addresses heavy-equipment theft risk on remote civil-works sites. The solicitation posted April 28 via SAM.gov. Pre-bid timing is the highest-value engagement window; once the GC submits and locks the security subcontractor line item, displacement is difficult. The project value is undisclosed in the source record, which is typical for smaller federal environmental remediation awards. Solicitation-stage signal means the buyer is actively forming the security budget this week or next. Pittsburgh branch is the nearest at 144 miles, well inside the 300-mile coverage radius. No warm-intro path exists in the payload. The first move is a phone call to the contracting officer named in the SAM.gov posting (typically the USDA Natural Resources Conservation Service district conservationist or the Corps' project manager) proposing a 15-minute conversation on mobile-tower availability for the equipment-laydown phase and overnight monitoring during active earthwork.

Project Facts

Owner
FPAC BUS CNTR-ACQ DIVFEDERAL AGENCY
Prime Contractor
Pre-award (no awardee yet)
Project Size
Not disclosed (open solicitation)
Estimated Towers
1-3
Industry
237990 · Other Heavy and Civil Engineering Construction
Stage
solicitation
Timing
RFP closes 06-03-26
Location
Valley Grove, WV38.4912, -80.9545
Permit
Not disclosed (federal contract)

Contacts

1 surfaced

Contacts — 1 at FPAC BUS CNTR-ACQ DIV

Bobby CopennyContracting Officermanagergatekeeper
source: sam.gov-pointOfContact· conf 100%

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

sam.gov

Solicitation details (sam.gov)

View on sam.gov
Agency
AGRICULTURE, DEPARTMENT OFFARM PRODUCTION AND CONSERVATION BUSINESS CENTERFPAC BUS CNTR-ACQ DIV
Contracting office
WASHINGTON, DC, 20250
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Solicitation #
12FPC326B0005
Bid window closes
2026-06-03 19:00Z(10d)
Archive date
2026-06-18

Activity timeline

  • Ranked · score 46
    Saw the Little Wheeling Creek EWP solicitation post April 28. Pittsburgh branch covers the corridor at 144 miles, worth a quick call on mobile-tower placement for the earthwork phase before your bid package closes?
    2026-05-02 10:31 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 10:31 · projects
  • Project ingested
    Source: sam.gov · posted 2026-04-28
    2026-04-29 00:04 · projects