Z1DA--Install Patient Ceiling Lift 583-26-509
Rationale
The project is a $358K VA facility ceiling-lift installation awarded April 21 to Calvary Contracting via SAM.gov. The scope is a single-trade medical-equipment install inside an occupied healthcare building, not a jobsite perimeter or equipment yard. Security angle is contractor-access monitoring during off-hours work phases and material-staging protection if vendor deliveries park overnight onsite, not permanent infrastructure. The award notice posted May 1. Federal VA projects of this size typically mobilize 30-45 days post-award, which puts site access in early June. Once the contractor's crew is onsite and the VA's facility security office approves badging protocols, third-party surveillance integration becomes administratively complex. The signal is post-award, with a narrow window before access protocols close. Pittsburgh branch is nearest at 146 miles, inside the 300-mile coverage radius. No warm customer path exists. The buying contact is the VA facility security manager or the contracting officer's representative listed on the SAM record, not Calvary's site lead. Recommend a direct call to the VA facility proposing temporary camera coverage for after-hours contractor access zones during the install phase.
Project Facts
Contacts
1 surfacedContacts — 1 at 250-NETWORK CONTRACT OFFICE 10 (36C250)
HubSpot
Relationship Context
1 matchWarm intro available — 1 match
“Colmar Contracting is already a Zedcor customer (2 active sites at Charlotte). The procurement team there is the natural warm-intro path into this opportunity.”
Outreach
Verifier
passed · all 4 checksverified on 2 of 4 — null-coordinate project, geographic checks skipped
Source Record
Solicitation details (sam.gov)
View on sam.gov ↗- Agency
- VETERANS AFFAIRS, DEPARTMENT OF›VETERANS AFFAIRS, DEPARTMENT OF›250-NETWORK CONTRACT OFFICE 10 (36C250)
- Contracting office
- DAYTON, OH, 45428
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- Solicitation #
- 36C25026Q0243
- Archive date
- 2026-05-16
Activity timeline
- Ranked · score 56Saw the ceiling-lift award post May 1, worth a quick call on temporary camera coverage for contractor access zones during off-hours install before the VA's badging protocols close?2026-05-02 07:41 · projects
- Verifiedverified on 2 of 4 — null-coordinate project, geographic checks skipped2026-05-02 07:41 · projects
- Project ingestedSource: sam.gov · posted 2026-05-012026-05-01 18:00 · projects