Department of the Interior award to ATHERTON CONSTRUCTION LLC: GRSM 149285/149368 - REHABILITATE SUGARLANDS HEADQUARTER…

usaspending · score 65 · 29.1 miNashville branch · 29.1 mi
Project Size
$27.7M
Stage
Contract awarded
Distance
29.1 mi
Posted

Rationale

The Sugarlands Headquarters rehabilitation is a $27.7M National Park Service infrastructure award covering two linked scopes: a headquarters building overhaul and water/wastewater system replacement across the Sugarlands visitor complex in Great Smoky Mountains National Park. The dual infrastructure footprint (building renovation plus underground utility corridors) and the active-park setting create overlapping security exposures: equipment lay-down yards, contractor staging areas, and visitor-flow management during construction. Mobile surveillance towers fit the extended work-zone pattern, and vehicle monitoring addresses contractor access control on NPS property where visitor traffic continues through the construction period. The award posted to USAspending under contract 140P2024C0046 with no disclosed execution date, typical for federal awards where mobilization lags contract signature by 60-120 days pending NPS site-access coordination and environmental clearances. The timing is post-award but pre-mobilization. Once Atherton Construction's site-security subcontractor locks, the budget line is set. The window is usable but narrowing. Nashville branch sits 29 miles from the project site, well inside the 300-mile coverage radius. No warm-intro path exists in the current Zedcor customer base. The recommended contact is Atherton Construction's project superintendent or NPS's contracting officer's representative (COR), both of whom will surface once mobilization planning begins. Lead with mobile-tower availability for the contractor staging area and propose a 15-minute walk-through of the lay-down footprint before equipment arrives.

Project Facts

Owner
Department of the InteriorFEDERAL AGENCY
Prime Contractor
ATHERTON CONSTRUCTION LLC
Project Size
$27.7M
Estimated Towers
8-15
Industry
237110 · Water and Sewer Line and Related Structures Construction
Stage
awarded
Timing
Location
TN35.7478, -86.6923
Permit
Not disclosed (federal contract)
Lot Size

Contacts

Contacts at Department of the Interior

Enrichment pending — click Run now to fetch.

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

USAspending

Award details (usaspending)

View on usaspending.gov
Recipient
ATHERTON CONSTRUCTION LLC
Awarding agency
Department of the Interior
Award ID
140P2024C0046
Place of perf.
TN

Activity timeline

  • Ranked · score 65
    Saw the Sugarlands Headquarters award to Atherton (contract 140P2024C0046). Nashville branch covers the site at 29 miles out, worth a quick call on mobile-tower coverage for the staging area before mobilization starts?
    2026-05-02 05:50 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 05:50 · projects
  • Project ingested
    Source: usaspending
    2026-04-29 00:04 · projects