Department of the Interior award to PERINI MANAGEMENT SERVICES, INC.: GLCA 318744 DESIGN BUILD - REPLACE CRITICAL WASTE…

usaspending · score 72 · 41.8 miPhoenix branch · 41.8 mi
Project Size
$42.3M
Stage
Contract awarded
Distance
41.8 mi
Posted

Rationale

The Glen Canyon wastewater-utility replacement is a $42.3M federal design-build award to Perini Management Services for critical infrastructure at a National Park Service site. The project sits in a remote location with extended construction duration typical of utility overhauls, creating exposure for equipment laydown, contractor staging, and after-hours site access. Mobile surveillance towers fit the pattern here better than fixed perimeter. the work zones will shift as trenching and pipe installation move through phases, and NPS sites often lack existing camera infrastructure that could be repurposed. The award appears in the USAspending record with no posted date, which usually means the obligation predates the current fiscal quarter and mobilization is either underway or imminent. This is a post-award, likely post-mobilization signal. Security procurement may already be locked with Perini's subcontractor roster, but utility projects of this scale run 18-24 months, and mid-contract security upgrades happen when theft or vandalism patterns emerge in the first 90 days. The window is narrow but not closed if Perini's current coverage proves inadequate. Phoenix branch is nearest at 42 miles, well inside the 300-mile radius. No warm customer path exists in the region. The recommended move is a cold outreach to Perini's project manager (name likely in the NPS procurement office public record or the design-build RFP archive) proposing a site walk-through focused on mobile-tower coverage for the active work zones and equipment yards during nights and weekends when NPS ranger patrols are thinnest.

Project Facts

Owner
Department of the InteriorFEDERAL AGENCY
Prime Contractor
PERINI MANAGEMENT SERVICES, INC.
Project Size
$42.3M
Estimated Towers
8-20
Industry
237110 · Water and Sewer Line and Related Structures Construction
Stage
awarded
Timing
Location
AZ33.7298, -111.4312
Permit
Not disclosed (federal contract)
Lot Size

Contacts

Contacts at Department of the Interior

Enrichment pending — click Run now to fetch.

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

USAspending

Award details (usaspending)

View on usaspending.gov
Recipient
PERINI MANAGEMENT SERVICES, INC.
Awarding agency
Department of the Interior
Award ID
140P2025C0058
Place of perf.
AZ

Activity timeline

  • Ranked · score 72
    Saw the Glen Canyon wastewater award to Perini in the federal record. Phoenix branch is 42 miles out, worth a quick call on mobile-tower options for the work-zone phases if your current security setup isn't covering nights?
    2026-05-02 09:30 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 09:30 · projects
  • Project ingested
    Source: usaspending
    2026-04-29 00:04 · projects