General Services Administration award to DAWN/HIGLEY JV II, LLC: DESIGN-BUILD SERVICES FOR PLAZA REPLACEMENT AT THE CAR…

usaspending · score 20 · 273.2 miOhio branch · 32.0 mi
Project Size
$44.1M
Stage
Contract awarded
Distance
273.2 mi
Posted

Rationale

The GSA design-build award for plaza replacement at the Carl B. Stokes Federal Courthouse in Cleveland is a $44.1M federal-obligated project with an extended construction footprint in a downtown secure facility. The courthouse perimeter sits in a dense urban block, and the plaza scope implies excavation, material staging, and months-long public-access restriction. all conditions that demand fixed camera arrays for perimeter monitoring and vehicle barriers at temporary access points. The federal-facility context raises baseline security requirements above typical commercial demolition and reconstruction work. The award posted via USAspending with no declared award date, but GSA design-build contracts of this size typically mobilize within 90-120 days of award. The project stage is post-award, which compresses the window. the GC's security subcontractor may already be under contract. The signal is viable only if the project is still in pre-mobilization planning, when scope adjustments and add-ons remain negotiable. Chicago branch is 273 miles out, inside the 300-mile coverage radius but at the edge; Cleveland sits in a coverage gap between Chicago and hypothetical eastern footprint. Chicago is the nearest branch at 273 miles, feasible but stretched for a federal courthouse project that may require frequent on-site coordination during installation. No warm customer path exists in the payload. The first move is to identify the GC's project manager at DAWN/HIGLEY JV II and ask whether the security subcontractor is locked or whether perimeter camera-array scope is still open. If the security package is closed, the lead defers unless Zedcor expands eastward into Ohio.

Project Facts

Owner
General Services AdministrationFEDERAL AGENCY
Prime Contractor
DAWN/HIGLEY JV II, LLC
Project Size
$44.1M
Estimated Towers
Industry
Stage
awarded
Timing
Location
OH40.3888, -82.7649
Permit
Not disclosed (federal contract)
Lot Size

Contacts

Contacts at General Services Administration

Contacts not enriched (lead score below threshold).

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

Request enrichment →

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

USAspending

Award details (usaspending)

View on usaspending.gov
Recipient
DAWN/HIGLEY JV II, LLC
Awarding agency
General Services Administration
Award ID
47PB5226C0009
Place of perf.
OH

Activity timeline

  • Ranked · score 20
    GSA awarded the Stokes Courthouse plaza replacement at $44M; is DAWN/HIGLEY's security subcontractor locked, or is perimeter camera-array scope still negotiable in the mobilization plan?
    2026-05-02 05:26 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 05:26 · projects
  • Project ingested
    Source: usaspending
    2026-05-01 18:00 · projects