Department of Transportation award to LPC CONTRACTORS INC: PROJECT PR ER PRMNT RPR (10) THE PROJECT CONSISTS OF REPAIRI…

usaspending · score 27 · 1535.7 miTampa branch · 1210.1 miWARM INTRO
Lead rejected — no_branch_coverage(2026-05-09)
Project Size
$80.7M
Stage
Contract awarded
Distance
1535.7 mi
Posted

Rationale

The PR-10 emergency repair award is an $80.7M federal-obligated hurricane-recovery project spanning six kilometers of damaged highway corridor between KM 41.6 and 47.5 in Puerto Rico. The scope includes embankment reconstruction, reinforced soil slope systems, and drainage restoration, which implies staged earthwork zones, equipment laydown areas, and extended site exposure across multiple months. Mobile surveillance towers fit the linear work-zone pattern and multi-phase construction timeline; vehicle monitoring and camera arrays address equipment security during off-shift periods in what is likely a thinly-monitored rural corridor. The award appeared in USAspending without a posted date, meaning the contract is already executed and mobilization is either underway or imminent. Hurricane-recovery projects typically move faster than standard FHWA work due to emergency-declaration funding pressure, so the pre-budget window is closed. The timing tier is post-award, which limits displacement opportunity but leaves a small window if the GC has not yet locked a site-security subcontractor for the full duration. Atlanta branch is the nearest Zedcor footprint at 1,536 miles, far outside the 300-mile coverage radius. Zedcor does not currently serve Puerto Rico, and establishing a temporary presence for a single project is not operationally viable without a regional equipment depot or a local partner agreement. This lead is geographically out of scope unless Zedcor expands Caribbean coverage or partners with a Puerto Rico-based security provider who can white-label mobile tower deployment.

Project Facts

Owner
Not yet enriched
Prime Contractor
Not yet enriched
Project Size
$80.7M
Estimated Towers
Not yet enriched
Industry
Not yet enriched
Stage
awarded
Timing
Not yet enriched
Location
18.2208, -66.5901
Permit
Not yet enriched
Lot Size
Not yet enriched

Contacts

Contacts at —

Contact lookup pending owner identification.

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Relationship Context

1 match

Warm intro available — 1 match

Region: FL
Ctc ContractorsFUZZYHouston · 2 sites
Ctc Contractors is already a Zedcor customer (2 active sites at Houston). The procurement team there is the natural warm-intro path into this opportunity.

Outreach

Verifier — Unverified

unverified
⚠ unverifiedpass count · 1

branch attribution mismatch — ranker=null recompute=atl-003; score drift ranker=0 recompute=17

Source Record

USAspending

Award details (usaspending)

View on usaspending.gov
Recipient
LPC CONTRACTORS INC
Awarding agency
Department of Transportation
Award ID
693C7322C000008
Place of perf.
PR

Activity timeline

  • Ranked · score 27
    Saw the PR-10 hurricane-recovery award land for LPC Contractors. We're Atlanta-based so outside Puerto Rico coverage, but if you're considering Caribbean expansion this $80M six-month project is a credible anchor customer.
    2026-05-09 07:00 · projects
  • Project ingested
    Source: usaspending
    2026-05-09 06:00 · projects