Department of Energy award to SILVER LAKE CONSTRUCTION LLC: COMPUTATIONAL SCIENCE AND ENGINEERING FACILITY SBA REQUIREM…

usaspending · score 46 · 144.1 miPennsylvania branch · 144.1 mi
Project Size
$45.6M
Stage
Contract awarded
Distance
144.1 mi
Posted

Rationale

The Department of Energy's $45.6M award to Silver Lake Construction for a Computational Science and Engineering Facility in West Virginia is a federal-obligated high-security target. DOE facilities typically require multi-layer perimeter security, surveillance camera arrays covering data-center entrances and loading areas, and vehicle barriers at ingress points. The project scale and federal compliance profile suggest both permanent infrastructure (camera arrays, vehicle monitoring) and temporary mobilization-phase coverage (mobile surveillance towers for the construction lay-down yard and equipment staging zones). The award appears in the USAspending federal obligation record with no posted date declared in the source payload. DOE construction awards of this size typically mobilize within 60-90 days of obligation, which means the window for pre-budget security engagement may already be closing. The award is post-contract but the mobilization timing is unclear from the public record. If the GC has not yet procured site-security services, the opportunity is still live; if they have, the federal compliance angle (camera systems for access logging, vehicle monitoring for perimeter audits) may still leave a post-mobilization upsell path. Pittsburgh branch is the nearest at 144 miles, inside the 300-mile coverage radius. No warm-intro path exists in the region. The first move is to contact Silver Lake Construction's project manager (the GC on record) and ask whether the DOE facility security scope is still open or whether the federal compliance layer (surveillance cameras, vehicle access logging) is being procured separately from the GC's site-security subcontractor. Lead with mobile-tower availability for the construction-phase lay-down yard and pivot to permanent camera-array scope if the compliance procurement is separate.

Project Facts

Owner
Department of EnergyFEDERAL AGENCY
Prime Contractor
SILVER LAKE CONSTRUCTION LLC
Project Size
$45.6M
Estimated Towers
8-25
Industry
236220 · Commercial and Institutional Building Construction
Stage
awarded
Timing
Location
WV38.4912, -80.9545
Permit
Not disclosed (federal contract)
Lot Size

Contacts

Contacts at Department of Energy

Contacts not enriched (lead score below threshold).

Source: USAspending does not publish decision-maker contact data. Contacts here come from Clay / Apollo / Hunter enrichment against the awarding agency.

Request enrichment →

HubSpot

Connect HubSpot to push this lead
Push leads from Pathfinder to your HubSpot portal as deals. Track stage updates, owner changes, and activity timestamps from this page.
Connect HubSpot

Outreach

Verifier

passed · all 4 checks
✓ verifiedpass count · 1

verified on 2 of 4 — null-coordinate project, geographic checks skipped

Source Record

USAspending

Award details (usaspending)

View on usaspending.gov
Recipient
SILVER LAKE CONSTRUCTION LLC
Awarding agency
Department of Energy
Award ID
89243324CFE000088
Place of perf.
WV

Activity timeline

  • Ranked · score 46
    Saw the DOE Computational Science facility award to Silver Lake in West Virginia. Pittsburgh branch covers the site at 144 miles, worth a call on whether the federal compliance security layer is still open or being procured separately from site security?
    2026-05-02 10:30 · projects
  • Verified
    verified on 2 of 4 — null-coordinate project, geographic checks skipped
    2026-05-02 10:30 · projects
  • Project ingested
    Source: usaspending
    2026-04-29 00:04 · projects