Galveston Co. flood control
Rationale
CACHEDThe Galveston County flood-control project is a $5.2M USACE-administered bay-front infrastructure effort with declared perimeter and equipment-yard security scope in the spec. The bay-front exposure and extended work-zone footprint support mobile surveillance tower deployment for equipment laydown and night-shift deterrence, and the NAICS 237990 (heavy civil) classification signals typical vehicle-barrier and camera-array requirements at the perimeter. The RFP posted April 12 with a May 26 response deadline, placing this in the pre-award solicitation window. USACE procurement timelines typically award 30-45 days post-close, so mobilization would begin late June or early July. This is the optimal timing tier: security scope is declared in the spec but the line item is not yet committed, and the response window leaves 44 days to surface Zedcor's capabilities before the GC locks the subcontractor roster. Houston branch sits 41 miles from the project site, well inside the 300-mile coverage radius. The recommended first move is a direct outreach to the listed GC respondents (visible in SAM.gov or USACE pre-solicitation notices) proposing a 15-minute technical call to walk through mobile-tower specs and perimeter-camera integration for the equipment-yard phase. The buying contact is typically the GC's estimating lead or project manager assembling the bid package.
Project Facts
Contacts
2 surfacedContacts — 2 at US Army Corps of Engineers
HubSpot
Outreach
Verifier
passed · all 4 checkspassed all 4 checks
Source Record
Activity timeline
- Ranked · score 84Saw the Galveston flood-control RFP post April 12 with declared perimeter and yard security scope. worth a quick call before May 26 close to walk through mobile-tower and camera-array specs for your bid package?2026-05-02 05:42 · projects
- Verifiedpassed all 4 checks2026-05-02 05:42 · projects
- Outreach drafted · emailGalveston Bay flood control: $5.2M security sub-line2026-05-01 14:46 · outreach_drafts
- Outreach drafted · linkedinUSACE Galveston Bay RFP has a $5.2M security sub-line due May 26. Zedcor HOU can2026-05-01 14:46 · outreach_drafts
- Outreach drafted · voicemailHi, this is calling from Zedcor Security Systems in Houston. The USACE Galveston2026-05-01 14:46 · outreach_drafts
- Project ingestedSource: usaspending · posted 2026-04-122026-04-28 02:08 · projects