Pathfinder / zedcor / leads / Design-Build Maintenance and Repair of the General Stilwell Memorial Army Reserve Center (ARC) Training Building, Bldg.…
No enrichment brief yet. The next Sonar pass will fill this in.
No founder records yet.
The General Stilwell Memorial Army Reserve Center design-build is a federal maintenance and repair contract on a training building at a military facility in Killeen, Texas. The active-jobsite nature of design-build scopes typically includes extended contractor access, equipment staging, and perimeter control during construction phases, which aligns with mobile surveillance tower deployment for overnight equipment protection and camera-array coverage of entry points and lay-down zones. Project value was not disclosed in the SAM.gov presolicitation record. The notice posted May 4, 2026, as a presolicitation, which is the earliest actionable stage in the federal procurement cycle. Pre-budget engagement on military facility work is the highest-value timing tier because security line items are often bundled into the design-build scope rather than competed separately after award. Once the RFP closes and bids lock, subcontractor selection is frozen. The window is 30-60 days from presolicitation to solicitation close on a project of this type. Houston branch is nearest at 158 miles, well within the 300-mile coverage radius. The buying contact on an Army Reserve Center design-build is typically the contracting officer listed in the final RFP or the facility security manager at the Killeen installation. Lead with mobile-tower availability for the construction phase and ask whether site-security scope is already defined in the draft RFP or still open for input before solicitation.