Pathfinder / zedcor / leads / TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202
No enrichment brief yet. The next Sonar pass will fill this in.
No founder records yet.
The Tinker AFB project replaces a vault and fuel tank at Building 3202, a high-sensitivity scope on an active Air Force installation. Federal fuel-handling sites carry strict perimeter and surveillance requirements during construction, both for operational security and contractor compliance with base access protocols. The work involves below-grade excavation, equipment staging, and likely a restricted-access zone around the fuel infrastructure. Value undisclosed in the source record, but vault and tank replacement on a military base typically runs $2M-$8M and supports mobile surveillance tower deployment for the lay-down yard and perimeter monitoring during off-shift hours. The SAM.gov presolicitation posted May 4, 2026. Pre-budget stage means the security line item is not yet locked, the best possible timing tier for engagement. Federal base projects of this type typically move from presolicitation to RFP in 45-60 days, and security scope is often bundled into the general contractor's site-plan package rather than direct-procured by the Air Force. The window to influence the GC's security subcontractor selection closes once the RFP drops. Tinker AFB sits 411 miles from Houston branch, outside the 300-mile coverage radius. Dallas branch is the nearest Zedcor footprint and should take the lead. No warm customer path exists in the payload. The buying contact is likely the contracting officer listed on SAM.gov or the prime contractor's project manager once awarded. Recommend monitoring the solicitation for the GC award and engaging immediately post-award with a base-access and fuel-site compliance angle.