Pathfinder / zedcor / leads / Drain Modifications

Drain Modifications

Score 55
sam.gov

Brief

No enrichment brief yet. The next Sonar pass will fill this in.

Founders

No founder records yet.

Snapshot

Source
sam.gov
Posted
5/8/2026

Why this scored 55

The $135,000 drain modification award went to Advanced Logistic Partners on May 8 via SAM.gov. The project sits at a federal facility near Jarrettsville, MD. Drain work typically requires excavation, equipment laydown, and controlled-access zones during the build phase. The confined-site pattern and equipment-exposure window fit mobile surveillance tower deployment for overnight monitoring and perimeter camera coverage during active work hours rather than permanent barriers. The award posted May 8, which means mobilization is imminent or already underway. This is post-award timing, the hardest window to displace an incumbent site-security vendor if one was already contracted. The signal is late-stage, but drain projects of this scope often run 30-60 days, and equipment-protection coverage during nights and weekends can still be scoped as an add if the GC has not locked yard-security terms. Pittsburgh branch is nearest at 147 miles, inside the 300-mile coverage radius but a long pull for a $135K base project unless the GC is a repeat customer or the site is part of a larger federal campus with future phases. No warm-intro path exists in the payload. The buying contact is likely the GC's project superintendent or the facility's security director if the work is on a federal installation. Recommend a brief outreach to confirm mobilization timeline and ask whether overnight equipment monitoring is scoped.