Pathfinder / zedcor / leads / TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1

TINKER AFB MAC BOA WWYK200051 Replace Switchgear, Bldg 1

VerifiedScore 15
sam.gov

Brief

No enrichment brief yet. The next Sonar pass will fill this in.

Founders

No founder records yet.

Snapshot

Source
sam.gov
Posted
5/1/2026

Why this scored 15

The Tinker AFB switchgear replacement is a federal Combined Synopsis/Solicitation for electrical infrastructure work in Building 1, classified under NAICS 236220 (commercial and institutional building construction). The work involves replacing critical power distribution equipment inside an active Air Force base, which creates a multi-phase security exposure: contractor access control during installation, equipment protection in staged laydown areas, and 24-hour site monitoring during any power-cutover windows. The project value is undisclosed in the SAM.gov record. The solicitation posted May 1, 2026. Federal base contracts typically move through a 30-60 day bid window, then award, then a 60-90 day mobilization lag before work begins. The timing is early-stage solicitation, the optimal window for pre-bid security planning. Once the GC's security subcontractor bid is locked into the package, the line item is set. The source is SAM.gov, which flags this as a competitive procurement rather than a sole-source award. Tinker AFB sits 411 miles from Houston branch, outside the 300-mile coverage radius. No warm Zedcor customer proximity exists in the record. The lead sits beyond current footprint and should defer unless Zedcor expands Oklahoma City coverage. If expansion is under consideration, the GC's project manager (typically named in the SAM.gov solicitation attachments once the bid package posts) would be the first contact for base-access security requirements and laydown-yard monitoring scope.