Pathfinder / zedcor / leads / 10--Saratoga National Park Build Replacement Reproduct

10--Saratoga National Park Build Replacement Reproduct

Score 20
sam.gov

Brief

No enrichment brief yet. The next Sonar pass will fill this in.

Founders

No founder records yet.

Snapshot

Source
sam.gov
Posted
5/5/2026

Why this scored 20

The Saratoga National Park replacement-structure award is an $81,147 federal contract (NPS obligated) for a small-footprint building installation or reproduction structure at a historically-controlled site. The modest project value and historic-park context suggest a tightly-scoped build with limited jobsite exposure, but multi-month construction in a public-access park creates night-and-weekend equipment-protection and public-safety monitoring needs. Mobile surveillance towers fit the profile better than fixed perimeter. deployable units cover the active build zone without permanent infrastructure that conflicts with historic preservation mandates. The award posted May 5, 2026, via SAM.gov to D & H Hansen Inc (Letcher, South Dakota). Award-to-mobilization lag on a sub-$100K federal build is typically 30-45 days, which means site setup is imminent or already underway. The signal is post-award; if the contractor has not yet procured site security, the window is narrow but not closed. If procurement is locked, this is a prospecting contact for the next Saratoga park project rather than an immediate sale. Pittsburgh branch is the nearest at 288 miles, just inside the 300-mile coverage radius. No warm-intro path exists in the geography payload. The buying contact is likely the NPS project manager or Hansen's site superintendent. Lead with a brief call on mobile-tower rental for the active build phase, framed as public-safety and equipment-protection coverage during off-hours without permanent park infrastructure.