Pathfinder / zedcor / leads / TINKER AFB MAC BOA WWYK250013 - Renovate to Open Storage B1115

TINKER AFB MAC BOA WWYK250013 - Renovate to Open Storage B1115

VerifiedScore 15
sam.gov

Brief

No enrichment brief yet. The next Sonar pass will fill this in.

Founders

No founder records yet.

Snapshot

Source
sam.gov
Posted
5/1/2026

Why this scored 15

The Tinker AFB Building 1115 solicitation converts an existing structure to open storage, a renovation scope that typically requires controlled-access perimeter during the tear-out and reconfiguration phases. Federal Air Force Base installations impose strict vehicle-access protocols and continuous surveillance during construction, which aligns with vehicle barriers at entry points, camera arrays covering the work envelope, and mobile surveillance towers for overnight equipment protection. Project value is undisclosed in the source record; the solicitation posted May 1 via SAM.gov. The project is at the solicitation stage, the optimal pre-budget timing tier for security engagement. Air Force construction solicitations typically close bids 30-45 days after posting, then proceed to award and mobilization. The security line item is still open for influence during the GC's bid-assembly window. Once the contract awards and the security subcontractor locks, the opportunity narrows sharply. The project sits 411 miles from Zedcor's Houston branch, outside the 300-mile coverage radius. Oklahoma City would be the natural footprint, approximately 10 miles from Tinker AFB, but Zedcor does not currently operate that territory. The lead should either defer pending a future Oklahoma expansion or escalate to leadership if Tinker's repeat-contracting potential justifies the logistics premium of servicing from Houston.