Pathfinder / zedcor / leads / Streambank Stabilization Project – Little Wheeling Creek Site – EWP 2025 Ohio County, West Virginia

Streambank Stabilization Project – Little Wheeling Creek Site – EWP 2025 Ohio County, West Virginia

VerifiedScore 46
sam.gov

Brief

No enrichment brief yet. The next Sonar pass will fill this in.

Founders

No founder records yet.

Snapshot

Source
sam.gov
Posted
4/28/2026

Why this scored 46

The Little Wheeling Creek streambank stabilization is a federal Emergency Watershed Protection solicitation involving linear earthwork along an erosion corridor. The project sits in a rural footprint with limited natural oversight, and the work pattern (grading, riprap placement, bioengineering installations) creates extended equipment exposure during nights and weekends. Mobile surveillance tower coverage fits the linear corridor better than fixed perimeter infrastructure, and vehicle monitoring addresses heavy-equipment theft risk on remote civil-works sites. The solicitation posted April 28 via SAM.gov. Pre-bid timing is the highest-value engagement window; once the GC submits and locks the security subcontractor line item, displacement is difficult. The project value is undisclosed in the source record, which is typical for smaller federal environmental remediation awards. Solicitation-stage signal means the buyer is actively forming the security budget this week or next. Pittsburgh branch is the nearest at 144 miles, well inside the 300-mile coverage radius. No warm-intro path exists in the payload. The first move is a phone call to the contracting officer named in the SAM.gov posting (typically the USDA Natural Resources Conservation Service district conservationist or the Corps' project manager) proposing a 15-minute conversation on mobile-tower availability for the equipment-laydown phase and overnight monitoring during active earthwork.