Pathfinder / zedcor / leads / Department of Veterans Affairs award to RICHARD GROUP LLC: THE CONTRACTOR SHALL PROVIDE ALL TOOLS, EQUIPMENT, MATERIALS…
No enrichment brief yet. The next Sonar pass will fill this in.
No founder records yet.
The VA EHRM Infrastructure Upgrades project is a $35.5M federally obligated construction award for electronic health record modernization infrastructure at a Department of Veterans Affairs facility. The scope. tools, equipment, materials, labor for full infrastructure build-out. implies data center work, electrical upgrades, network backbone installation, and substantial equipment staging areas. The physical footprint supports mobile surveillance tower deployment during lay-down and night-shift phases, plus camera-array coverage of equipment zones and vehicle monitoring at controlled access points during the multi-month build. The award posted to USAspending under contract 36C77622C0107 with RICHARD GROUP LLC as the prime contractor. No posted date appears in the source record, so mobilization timing is uncertain, but VA infrastructure projects of this value typically carry 90-120 day pre-mobilization windows after award. The project stage is awarded but pre-mobilization status is unconfirmed; contact RICHARD GROUP directly to surface their site-security procurement timeline. Once the GC locks their security subcontractor, displacing the line item is difficult. Chicago branch is the nearest Zedcor footprint at 193 miles, inside the 300-mile coverage radius. No warm-intro path exists in the payload. The most likely buying contact is RICHARD GROUP's project superintendent or the VA facility's security director if the contract allows direct-to-owner engagement. Lead with mobile-tower availability for the equipment lay-down phase and ask whether site-security procurement is still open or already subcontracted.